INSULATED SMART GLASS UNITS
iSwicth ISGU
Incorporating Switchable Smart Glass Technology into Insulated Glass Unit
- The latest generation of ISGU’s combines the benefits of improved thermal performance with immediate control over privacy/security.
- Energy-efficient Insulated Smart Glass Unit (ISGU’s) with the integral switchable coating is ideal for both commercial buildings and residential homes.
- The (PDLC) switchable layer is coated down on the inner surface of one panel of glass, then hermetically sealed forming two of more lites of glass separated by a dry air spacer.
- ON-OFF mode switches the ISGU from being clear (transparent) to frosted (opaque).

ISGU Features
We offer a double or triple glazed option, which combines all the benefits of superior thermal glazing with switchable technology.
ISGU offers thermal insulation performance, sound reduction and enhanced security.
Glass Thickness
- 3/16" (5mm)
- 1/4" (6mm)
- 5/16" (8mm)
- 3/8" (10mm)
- 1/2" (12mm)
ISGU Maximum Size
- 60’’ x 137’’

Double or Triple ISGU
LOW-E COATING

Low E coating increases thermal performance by reducing ultraviolet and infrared light coming through the glass, but it doesn’t compromise the amount of visible light that is transferred.
Low Emissivity (low E) Glass
Low E is a common abbreviation of “Low Emissivity”. Low Emissivity means a surface that gives off low levels of radiant heat. Therefore, a glass window with a Low E coating will reduce the amount of heat transfer, making your house warmer in the winter and cooler in the summer.

Low-Iron Glass
Nearly invisible low-iron glass is the clearest glass on the market today. Low-iron glass is produced through a special process in which the iron particles are removed from the glass.
The iron particles are what give the regular glass a greenish tint. Removing these particles results in an ultra-clear glass.
Argon Gas
Argon gas is a naturally occurring, non-harmful gas. When argon gas is inserted between the panes of glass it increases the insulating performance of ISGU. Argon gas is denser than air, so adding it to the air between the two panes improves thermal insulation efficiency.
When a glazing unit features Low E glass and argon gas it brings the temperature of the window closer to room temperature. This combination eliminates air currents and drafts that occur when differing temperatures meet.


Spacers
Our switchable ISGU’s utilize a warm edge spacer bar with desiccant absorbent to offer greater insulation and performance. When it’s cold outside and warm inside, heat escapes through the spacer leaving the inside edge of the window colder than the rest of it. This heat loss means more heating is needed to maintain a comfortable indoor temperature. Under certain conditions, especially in colder temperatures, the moisture we breathe and produce from cooking and everyday living condense on the coldest surface, usually along the edges on the inside of the window. Over time persistent condensation becomes a breeding ground for mold and bacteria. Mold spores get into the air we breathe and can aggravate breathing conditions and other health problems.
iSwitch Film™ Technical Data


Multitude of Control Options
Switch Glass™ & iSwitch Film™ can be controlled with a variety of devices and can be easily configured to work with your smart home through the z-wave technology.

- SIMPLE SWITCH
- DIMMER
- SMART PHONE
- REMOTE
- ALEXA & GOOGLE HOME

ISGU is simple to install just like any standard glazed sealed unit.
This energy-saving product is completely solid-state requiring no maintenance or special cleaning requirements.
Imagine living in a world which offers you complete control over your comfort/privacy/security all at the flick of a switch, without the fuss and clutter of blinds or curtains.
How to place an order?
1. GET IN TOUCH
Send us with the measurements, total square footage and speak with a technician to get a better understanding about the Smart Glass Units.
2. APPROVE THE QUOTE
We will send the Estimate and contact you to answer all the questions you may have.
3. MANUFACTURE
The average time to manufacture the smart glass units is 15-25 days depending on the size and scope of your project.
4. DELIVERY & INSTALLATION
We deliver the Smart Glass Units to your door and we assign a project manager who can assist you with installation.